Stub Siding Added to Auto Back and Forth

Moderator: SEPGRS-Officers

Stub Siding Added to Auto Back and Forth

Postby BryanDelMonte » Tue Sep 17, 2013 1:54 pm

Wiring is completed for new stub siding following the recent article in Garden Railways Magazine.

On Sunday, I painted the two new roadbed pieces that arrived with just primer.

Next, I need to remove one foot piece of roadbed with track and insert the switch with stub siding.

Bryan
Attachments
P9160003_01.jpg
Ready to insert the switch with stub siding.
P9160003_01.jpg (435.49 KiB) Viewed 2832 times
P9160002_01.jpg
Center Hillman rail camp is insulator type with two power conditions on either side of it.
P9160002_01.jpg (315.07 KiB) Viewed 2832 times
P9160001_01.jpg
Standard house switch is connected to two power conditions on either side of insulator rail clamp.
P9160001_01.jpg (382.14 KiB) Viewed 2832 times
BryanDelMonte
Brakeman
 
Posts: 180
Joined: Mon Mar 28, 2011 7:26 am
Location: West Chester, PA

Re: Stub Siding Added to Auto Back and Forth

Postby BryanDelMonte » Sun Sep 29, 2013 2:04 pm

I finished adding a new stub siding to my automated back and forth run (point to point) that runs on DC power with reversing and timing circuit with my Bonanza Goldrush Garden Railway.

[BBvideo 425,350]http://youtu.be/dQ8VD7TNbYs[/BBvideo]

It was a bit more work then expected, but plan on a loco shed that will make use of it.

Bryan
BryanDelMonte
Brakeman
 
Posts: 180
Joined: Mon Mar 28, 2011 7:26 am
Location: West Chester, PA


Return to Wiring & Train Control

Who is online

Users browsing this forum: No registered users and 1 guest

cron

x